A dedicated client-side project manager and a builder, working as one.
You became a doctor to treat patients, not to manage a build. We put a dedicated project manager on your side of the table to run the whole fitout, so you never have to.
One partner, concept to handover. Plain-English updates, every week. And a layer of governance that holds the builder to scope, program and quality, so costs don't creep and deadlines don't slip.
We handle the compliance general contractors can't:
ARPANSA radiation safety
RACGP, RANZCR and ADA accreditation
National Construction Code (NCC) and AS standards
Fire, safety and electrical certification
And it doesn't end at handover. We can stay on to manage your ongoing compliance too, medical, industry, fire and safety, and electrical, so your clinic stays audit-ready long after it opens.
How it works: one team on your side of the table.
01
The Client
You set the clinical brief and the vision for the practice.
→
02
Client-Side PM
Your project manager. Runs the project end-to-end and acts only in your interest.
Your clinic delivered to your vision, exactly as you expected
Variations resolved quickly and cost-effectively, so your clinic opens on schedule
Full compliance (ARPANSA, RACGP, RANZCR, ADA, NCC, AS)
Builder held to scope, program and deadline
Problems solved before they reach you
The hard conversations, so you never have to
→
03
The Builder
Delivers the physical fitout under our management, held to scope, program and quality.
From a single practice to a national footprint, we deliver for medical operators of every size, and we help them grow their presence across Australia.
Corporate & national operators
Multi-site rollouts for corporate clients, run to a repeatable program so every clinic opens on time and to the same brand and quality, anywhere in the country.
Private medical groups
Established groups opening new clinics and moving into new locations, delivered to one consistent standard across every site.
Independent clinic owners
Owners opening their first practice or growing into new sites. We scale the process to the project, with the same rigour we bring to the largest builds.
60+ clinics. Locations across Australia. One standard.
We deliver medical fitouts in Brisbane, Sydney, Melbourne and beyond. Wherever the build is, we run it on your side of the table, with builder partners matched to your project, managed by us throughout.
Ready to start planning your clinic?
Tell us about your project. We'll respond within 24 business hours.
About
We run your entire fitout from your side of the table, from the first conversation to the final handover.
We manage the delivery, the build and the compliance, so you can focus on your patients and your practice. One partner, concept to commissioning. One point of contact. Plain-English updates the whole way.
The way we work came straight from the doctors and medical groups we've sat across from, telling us, time and again, how their projects actually go. Costs creeping in unflagged. Updates written in builder language they couldn't decode. Deadlines slipping. Decisions stalling because no one made clear what needed deciding or when.
Our model is built to fix that. A dedicated client-side project manager whose only job is to protect your interests, holding the builder to deliver, keeping costs honest, and protecting quality and program. A second layer of governance that sits between you and the builder, on your side of the table.
General Practice
GP clinics
Vaccination & travel medicine
Aged care medical centres
Radiology
X-ray
CT & MRI
Ultrasound
Pathology & blood collection
Specialist
Cardiology & dermatology
Orthopaedics & ophthalmology
Sports medicine
Women's health & paediatrics
Oncology & infusion
Sleep, audiology & IVF
Allied Health
Physiotherapy
Podiatry
Occupational therapy
Speech therapy
NDIS & disability hubs
Pharmacy
Retail dispensaries
Compounding pharmacies
Dispensary fitouts
Dental
General practice
Specialist centres
Multi-chair practices
OPG suites
Day Surgery
Procedure rooms
Day surgery suites
Recovery areas
Sterilisation units
Hospital
Ward refurbishments
Operating theatres
Outpatient departments
Our core values. The principles that govern every project.
Compliance from day one, not just at handover. Value managed through every variation. One partner from concept to commissioning. And updates you can actually act on.
This is how we keep doctors out of the build, and how we keep clinics open once they're built.
Compliance
We keep you compliant with every regulatory board and audit-ready from day one. Built to strict national clinical standards (ARPANSA, NCC, AS). Audit-ready at every stage, not just at handover.
Value Management
When the unexpected comes up, we confirm the fix is genuinely needed, test the price against the market, and scope the right-sized solution, not the most expensive one. Materials value-engineered where it's safe to, never where it compromises compliance.
Start-to-Finish Delivery
One partner, concept to commissioning. A single point of contact for the entire project. Nothing for you to coordinate, no chasing, and no surprises, just a clinic delivered and ready to operate.
Stakeholder Communication
Plain-English updates, no builder talk. You always know where things stand and what you need to decide. Decisions surfaced when they matter, with the context to make them quickly and confidently.
Equipment partners we coordinate with
Our Process
Full client-side project management, with the build delivered under our management. One team, one point of accountability, from concept to handover.
The Medical Fitout Model:
How it works: A dedicated client-side PM sits directly between you and the construction team, managing design, documentation and the builder on your behalf. One contact, from first meeting to handover.
01
The Client
Doctor · Clinic owner · Medical group
The doctor, practice or medical group commissioning the fitout. You set the clinical brief. We run everything else.
Responsibilities
Set the clinical and commercial vision for the practice
Stay focused on patients, not project management
One point of contact, us, for every decision and update
No chasing builders, councils, vendors or consultants
Clear, jargon-free reporting throughout the build
Project updates
02
Client-Side PM
Your project manager
Sits on your side of the table. Runs the project end-to-end. Acts in your interest at every decision point, not the builder's.
Responsibilities
Plans the project and sets a realistic, protected budget
Secures council, planning and regulatory approvals
Coordinates CT, MRI and specialist equipment vendors
Governs program, cost and compliance through to handover
Verifies and market-tests variation costs before you pay them
Project delivery
03
The Builder
Under our management
Sits under our project management. Delivers the physical fitout to medical-grade standards.
Responsibilities
Local trades and site management matched to your location
CT and MRI room coordination, radiation shielding, lead-lined doors
All services and finishes through to a certified, operational practice
Held to scope, program and quality by our project manager
Handover to a clinic ready to see patients on day one
Your project manager carries you through every step.
Opening a clinic is a full-time job on top of your full-time job. You shouldn't be chasing builders, decoding council letters, or piecing together where things stand. We make sure you never have to.
From the first conversation to opening day, you have one project manager on your side of the table. Same person, same number, every week. We keep the build moving and translate what matters into plain English, so you always know where things stand, what's next, and what needs a decision from you. No surprises, no jargon.
Nine steps across three phases. Each one is handled for you, not by you.
60+Clinics delivered since 2014
8Weeks on average, construction start to completion
1Point of contact, start to finish
Phase One: Planning and advisory
The critical work happens before construction starts. We shape your project, lock in the budget, and prepare full documentation, so the build begins with no unknowns.
1
Initial Concept Design
We start with you. We discuss your goals and how you envision your clinic, then mock up an outline of the space with rough finishes so you can see it take shape. Includes a complimentary budget estimate or quote.
2
Budget Estimate
We build a detailed budget tailored to your project, setting out specifics, timelines and key considerations so you know exactly what is ahead.
3
Full Documentation
Once the budget is approved, we prepare the complete set of drawings, specifications and compliance documents, reviewed for accuracy and ready for construction.
Phase Two: Construction and delivery, managed by us throughout
Once documentation is signed off, our builder partner takes the work on the ground and we run the project around them, holding the program, compliance and cost.
4
Project Commences
With contracts signed and documentation in place, our builder partner starts work while we run the project, keeping you informed at every stage.
5
On-Site Construction
From foundations to final touches, we oversee the build on the ground, holding the program and compliance and coordinating vendors, so it is delivered the way you need it.
6
Completion and Certification
We refine the detail, inspect every element, and secure all certifications so your space is safe, compliant and ready to operate.
Phase Three: Post-delivery care and ongoing support
Handover isn't the end. We remain your single point of contact through the defect period, follow-up inspections, and any after-care the practice needs.
7
Warranty & Defect Management
We manage the defect liability period on your behalf, coordinating any rectification works and holding the builder to the scope of the original contract. Nothing falls through the cracks once the keys are handed over.
8
Follow-up Inspections & Quality Checks
Scheduled site inspections at agreed intervals after handover. We verify that all systems are performing to specification: HVAC, services, radiation shielding, fit-out finishes, and address anything that needs attention before the warranty period closes.
9
After-sales Support & Maintenance
Ongoing access to our team for any questions, minor works, or changes as your practice evolves. Whether it is adding a room, upgrading equipment or refurbishing a zone, we are already across the building and can respond without the usual project warm-up time.
Project Enquiry
A few quick questions about your project. We respond within 24 business hours.
1
What kind of project are you planning?
Pick the option that best describes where you're at.
New FacilityFacility ExpansionEquipment UpgradeRenovationConsultation Only
2
When are you looking to get started?
Select the timeframe that best reflects your readiness.
Address or suburb and state. We deliver Australia-wide.
4
Tell us a bit about the project.
Clinic type, equipment, timelines, anything we should know.
5
Your details
Projects
Specialists in the delivery of medical fitouts across Australia.
60+ clinics delivered since 2014. Case studies will be added here shortly. In the meantime, get in touch and we'll walk you through relevant past deliveries.
Completed
Victoria Point, QLD
In Progress
Browns Plains, QLD
In Progress
Gympie, QLD
In Progress
Greenslopes, QLD
In Progress
Sinnamon Park, QLD
Index
Location
Status
(01)
Victoria Point, QLD
Completed
(02)
Browns Plains, QLD
In Progress
(03)
Gympie, QLD
In Progress
(04)
Greenslopes, QLD
In Progress
(05)
Sinnamon Park, QLD
In Progress
(06)
Coolum, QLD
Completed
(07)
Loganholme, QLD
Completed
(08)
Nambour, QLD
Completed
(09)
Noosa Junction, QLD
Completed
(10)
Rochedale, QLD
Completed
(11)
Tewantin, QLD
Completed
(12)
Dapto, NSW
Completed
(13)
Engadine, NSW
Completed
(14)
Haymarket, NSW
Completed
(15)
Liverpool, NSW
Completed
(16)
Woonona, NSW
Completed
(17)
Warilla, NSW
Completed
(18)
Findon, SA
Completed
(19)
Klemzig, SA
Completed
(20)
Marion, SA
Completed
(21)
Morphett Vale, SA
Completed
(22)
Unley, SA
Completed
(23)
Botanic Ridge, VIC
Completed
(24)
Bulleen, VIC
Completed
(25)
Carnegie, VIC
Completed
(26)
Coburg, VIC
Completed
(27)
Diamond Creek, VIC
Completed
(28)
Frankston, VIC
Completed
(29)
Greensborough, VIC
Completed
(30)
Hampton East, VIC
Completed
(31)
Lilydale, VIC
Completed
(32)
Lynbrook, VIC
Completed
(33)
Mentone, VIC
Completed
(34)
Mornington, VIC
Completed
(35)
Mulgrave, VIC
Completed
(36)
North Melbourne, VIC
Completed
(37)
Reservoir, VIC
Completed
(38)
Ringwood, VIC
Completed
(39)
Thornbury, VIC
Completed
(40)
Williamstown, VIC
Completed
(41)
Colac, VIC
Completed
(42)
Kangaroo Flat, VIC
Completed
(43)
Kyabram, VIC
Completed
(44)
Sebastopol, VIC
Completed
(45)
Shepparton, VIC
Completed
(46)
Torquay, VIC
Completed
(47)
Werribee, VIC
Completed
Let's talk.
Have a project in mind? Tell us about it and we'll walk you through relevant past deliveries.
A leading imaging group required the delivery of a comprehensive radiology facility within a heritage-listed building in Brisbane's CBD, incorporating CT, MRI, ultrasound and general X-ray within strict heritage constraints.
The Medical Fitout coordinated heritage consultants and equipment vendors to design a solution that preserved significant building fabric while achieving full regulatory compliance. Specialist shielding solutions were managed to work within existing structural limitations, lead-lined doors, frames and walls installed without compromising the protected facade.
Full heritage compliance with the Queensland Heritage Council. Radiation safety certification achieved first time. Minimal disruption to adjacent tenants during delivery. The project was handed over two weeks ahead of schedule and operational immediately.
“The Medical Fitout understood the complexity of delivering within a heritage environment. Their attention to detail and proactive communication made a challenging project feel manageable.”, Practice Manager, Metro Imaging Group